Commercial

  • Protect Crete X550 & X100 solution for large warehouse development

    Auckland based concrete placing specialists RGC Business Development Manager Brent Atkinson needed a solultion for the concrete treatment of a large new warehouse developmet in Wiri being built by Bodley Construction.

    January 21, 2021
  • Protect Crete X550 CARPARK Warehouse™ chosen for freight hub

    Bed, Bath & Beyond freight handling area gets special treatment Auckland based concrete grinding and finishing specialists Solid Floors Limited director Grant Foster needed a solution to supress dusting and contamination of the Bed Bath & Beyond Wiri central hub freight handling area. With direct access into the main warehouse dusting and contamination from the

    November 26, 2020
  • Lightweight re-levelling of sunken concrete subfloor

    Uzin Turbolight System used at Fletcher Building Penrose Campus Introduction: Fletcher Building is redeveloping its 2.2 hectare Penrose head office campus. The redevelopment of the complex is due for completion in the third quarter of 2016 with four existing office buildings undergoing refurbishment. Scope of Work: Project Architect Mr Paul Morrison of Warren and Mahoney

    November 26, 2020
  • Dealing with aged concrete floor with moisture issues

    Old floor given new life thanks to Gilt Edge Seamless Flooring System Area: Approximately 300m2 Contractor: Contract flooring team with Project Manager Carlos Hedge. Challenge: Existing floor area was an aged concrete floor that required levelling , and had high RH moisture issues. The old flooring was removed and a new carpet tile installation was required. Solution: The existing

    November 26, 2020
  • Elegant results with the highest level of safety

    The 1936 heritage-listed, beautifully detailed Auckland Hotel Grand Windsor was recently renovated to 5 star standards.

    November 3, 2020